Engineering
Prototyping & sampling
Most programmes need a part before they need a price. Samples from existing tooling usually ship in one to three working days, with a dimensional report attached.
Sample types
Four routes to a part in your hand
The fastest route depends on how far your geometry is from our standard range. Be honest about the stage you are at — a machined sample will not prove a production process.
1 – 3 working days
Standard sample
A size and finish already in our standard range. Shipped from stock or from the next scheduled run, with a dimensional report.
Best for: design feasibility, fit checks, assembly trials
5 – 8 working days
Modified standard
A standard diameter with a different length, head or drive geometry. Produced by modifying existing tooling rather than building new.
Best for: design iterations, prototype builds, pre-production validation
7 – 12 working days
New tooling
A new heading die for a geometry outside our existing range. Includes die design, build, trial and sample dimensional report.
Best for: new programmes, custom head or drive, production intent
2 – 3 weeks
Pilot batch
A small production run, typically 5,000–20,000 pieces, through the full process including coating and sorting.
Best for: line trials, PPAP samples, customer qualification
Timeline
What takes how long
Durations are working days from receipt of a complete drawing and agreed quotation. Coating and PVD add to the sample date because batches run on a schedule.
| Stage | Typical duration | Output | Notes |
|---|---|---|---|
| Drawing review | 1 – 2 working days | Marked-up drawing, questions, feasibility | Starts when drawing + mating material are received |
| Quotation | 1 – 2 working days | Price by quantity, tooling cost, lead time | Issued after the review is agreed |
| Tooling design and build | 7 – 12 working days | New heading die and punch set | Complex custom drives take longer |
| First sample | 1 – 3 working days after tooling | 10 – 50 pieces, dimensional report | Includes first-off inspection |
| Coating and finishing | 3 – 7 working days | Coated samples | PVD batches run on a fixed schedule |
| Pilot batch | 2 – 3 weeks | 5,000 – 20,000 pieces | Full process, sorted and packed |
| PPAP submission | 1 – 2 weeks after pilot | PPAP package per agreed level | Requires frozen drawing |
Custom drives, security recesses and multi-diameter pins take longer because the punch geometry must be developed and trialled. We confirm the specific lead time with the quotation.
Sample report
What arrives with the parts
A sample without data is a souvenir. Every sample shipment includes a dimensional report so your engineer can compare the part to the drawing before the assembly trial begins.
01
Dimensional results against the ballooned drawing
02
Material certificate and heat number
03
Hardness and case depth where applicable
04
Coating thickness at head, shank and thread root
05
Thread gauge result (GO / NO-GO)
06
Functional notes — drive, seating, burr
07
Photographs of the sample at 10× and 30×
08
Deviation list, if any callout could not be met
To start
Five things we need
- Drawing (PDF) or 3D model (STEP / IGES)
- Mating material and engagement length
- Finish requirement, including colour if visible
- Annual volume and first-year forecast
- Required sample date and delivery address
Questions
Sampling FAQ
Practical questions from design and procurement teams.
Are samples free?
Can you ship samples by express courier?
What do you need from me to start?
Can samples be made without tooling?
How many samples should I request?
Need a part this week?
Send the drawing now. If it is inside our standard range, samples can leave Bekasi in one to three working days.