Manufacturing in Bekasi, West Java — Indonesia ISO 9001 · IATF 16949 · ISO 14001 · ISO 45001

Engineering

Engineering support for millimetre-scale joints

A drawing tells us the geometry. It does not tell us the clamp load, the service cycles or the resin grade — and that is usually where the problem is.

2-day reviewSamples in 1–3 daysJoint calculationPPAP support

Services

What we actually do before quoting

Most suppliers quote the drawing as written. We review it first, because a part that is expensive to inspect is usually expensive to make — and often not necessary.

Manufacturability review

We check whether the drawing can be produced repeatably at the tolerance stated — and which callout is driving cost. Feedback comes as marked-up comments, not a rejection.

Tolerance stack analysis

Where the fastener sits in the assembly, what it contributes to the stack, and whether a different head or fit would recover height or alignment.

Joint and torque calculation

Target preload, friction coefficient, strip torque and safety margin computed for the actual mating material and engagement length.

Material and finish selection

Corrosion, friction, conductivity, magnetism and cosmetic requirements translated into a named material and a named coating process.

Prototype and pilot build

Samples from existing tooling in one to three days, with a dimensional report. New tooling in seven to ten working days.

Production ramp support

PPAP documentation, first article inspection, packaging specification and line-side trials for automated driving.

Process

From drawing to production

Six steps, with a defined output at each one. No stage begins before the previous one is agreed.

Send the drawing

PDF drawing plus STEP file, with the mating material and annual volume. A photo of the assembly helps more than a perfect drawing.

Engineering review

Within two working days: feasibility, tolerance comment, process route and any question we need answered.

Quotation

Price by quantity band, tooling cost if required, lead time and the documentation included.

Sample

One to three days from existing tooling; seven to ten for a new die. Dimensional report included.

Validation

Fit and function test in your assembly, torque verification, and any reliability testing required.

Production

Lot release with inspection report, then repeat orders against the frozen drawing.

Common findings

What we usually ask you to change

These come up in a large share of first reviews. None of them is a criticism of the design — they are the difference between a drawing and a manufacturable specification.

Typical review findings and resolutions
Issue raised at reviewWhy it mattersUsual resolution
Head height tolerance tighter than the stack requires Drives cost with no functional gain Relax to the nearest achievable band, or change head profile
Thread class 6f on a clamping-only joint Reduces tolerance to coating and raises cost Use 6g, or add a shoulder for location
Coating specified without thickness Salt spray and thread fit become unpredictable Name the process and the thickness range
No mating material stated Torque and strip values cannot be verified State the material grade and engagement length
Length measured from the point on a flat head Ambiguous callout causes inspection disputes Dimension from the bearing face and state the reference
Surface finish required on an uncoated carbon screw Rust appears before the part reaches the line Specify a coating or switch to stainless
Burr limit not stated Functional failures in feeders and contacts State burr height as a fraction of shank diameter

Send the assembly, not just the screw

A drawing plus the mating material, service condition and annual volume is enough for a meaningful review. We reply within two working days.